RAKOVA JELŠA II
Our engineers are working on the new neighborhood “RAKOVA JELŠA II” project in Ljubljana, where six residential buildings are being built.
We performed Pile Static Load Testing, Pile Dynamic Load Testing (DLT) and Pile Integrity Testing (PIT) on FDP piles, Ø500mm, L= up to 16,5m.
For DLT, our 5 ton free fall weight hammer with Load cell was used.
« Back
« Back to the list