logo
Geotechnics & Pile Testing

STATIC PULL OUT TEST

A new power line 2x400kV CIRKOVCE-PINCE (L=80km) is being built in eastern Slovenia.  
 
SLP performed Pull-out Static Pile Testing on cast in place piles Ø1000mm with length up to 28m.
 
The tests were performed in accordance with ASTM D3689, »Standard Test Method for Deep Foundations Under Static Axial Tensile Load«.

 

« Back « Back to the list