logo
Geotechnics & Pile Testing

POST OFFICE CENTER

An expansion of logistic center of slovenian post office is being built in Ljubljana. SLP engineers performed  Pile Dynamic Load Testing (DLT) on driven concrete piles dimensions 40x40.

« Back « Back to the list